IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0578 # 06 Y:2019 06 2019 DEVELOP A REPAIR/REPLACE POLICY $5,469 $692 Implemented
WV0578 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,576 $3,000 Not Implemented
WV0578 # 08 Y:2019 08 2019 MINIMIZE WATER USAGE $1,375 $700 Not Implemented
WV0578 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,217 $46 Implemented
WV0578 # 10 Y:2019 10 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $174 $221 Implemented
UK1903 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $515 $0 n/a
UK1903 # 02 Y:2019 02 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,579 $0 n/a
UK1903 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,341 $0 n/a
UK1903 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $2,357 $717 n/a
UK1903 # 05 Y:2019 05 2019 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $311 $1,218 n/a
UK1903 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $486 n/a
UK1903 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,016 $11,658 n/a
UK1903 # 08 Y:2019 08 2019 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $332 $0 n/a
UK1903 # 09 Y:2019 09 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,326 $6,103 n/a
UD0997 # 01 Y:2019 01 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $5,924 $0 Implemented
UD0997 # 02 Y:2019 02 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,364 $0 Implemented
UD0997 # 03 Y:2019 03 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,727 $7,000 Not Implemented
UD0997 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $60,472 $17,300 Not Implemented
UD0997 # 05 Y:2019 05 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $17,400 $27,000 Not Implemented
UD0997 # 06 Y:2019 06 2019 RECOVER WASTE HEAT FROM EQUIPMENT $10,359 $2,540 Not Implemented
UD0997 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,640 $4,000 Not Implemented
UD0997 # 08 Y:2019 08 2019 INSTALL AUTOMATIC STACK DAMPER $19,943 $1,000 Not Implemented
UD0997 # 09 Y:2019 09 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,037 $50,514 Not Implemented
UD0997 # 10 Y:2019 10 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,439 $164,220 Implemented
UD0996 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,447 $0 Implemented