IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0898 # 11 Y:2014 11 2014 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $89,952 $75,900 Not Implemented
OK0898 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $6,545 $27,400 Implemented
OK0839 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $506 $3,114 Not Implemented
OK0839 # 16 Y:2013 16 2013 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,380 $0 Not Implemented
OK0839 # 08 Y:2013 08 2013 INSTALL SET-BACK TIMERS $921 $1,630 Not Implemented
OK0839 # 07 Y:2013 07 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,708 $5,684 Implemented
OK0839 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $667 $3,677 Not Implemented
OK0839 # 10 Y:2013 10 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $80,680 $63,370 Not Implemented
OK0839 # 09 Y:2013 09 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $873 $490 Implemented
OK0839 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,514 $27,500 Implemented
OK0839 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,395 $1,750 Implemented
OK0839 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,494 $33,218 Implemented
OK0839 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,540 $0 Implemented
OK0839 # 11 Y:2013 11 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $32,511 $25,606 Implemented
OK0839 # 12 Y:2013 12 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,901 $4,994 Not Implemented
OK0839 # 13 Y:2013 13 2013 OPTIMIZE PLANT POWER FACTOR $12,090 $11,638 Implemented
OK0839 # 14 Y:2013 14 2013 INSULATE BARE EQUIPMENT $1,275 $912 Not Implemented
OK0839 # 15 Y:2013 15 2013 INSULATE BARE EQUIPMENT $2,900 $4,158 Not Implemented
OK0771 # 07 Y:2008 07 2008 $2,068 $200 Not Implemented
OK0771 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $284 $1,213 Not Implemented
OK0771 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,001 $2,875 Not Implemented
OK0771 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,066 $0 Not Implemented
OK0771 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,458 $0 Not Implemented
OK0771 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,125 $3,460 Not Implemented
OK0771 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $12,463 $846 Not Implemented