IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

133

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0635 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,632 $440 Implemented
OK0635 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,070 $200 Implemented
OK0635 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,873 $300 Implemented
OK0559 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $660 Implemented
OK0515 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,757 $10,246 Implemented
OK0515 # 05 Y:1997 05 1997 $26,000 $0 Implemented
OK0515 # 03 Y:1997 03 1997 USE OTHER WASTE CONCENTRATION METHODS $1,080 $1,530 Implemented
OK0515 # 01 Y:1997 01 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,700 $150 Implemented
OK0515 # 02 Y:1997 02 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $924 $0 Implemented
OK0515 # 06 Y:1997 06 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,294 $12,700 Implemented
OK0491 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,329 $30 Implemented
OK0491 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $329 $655 Implemented
OK0491 # 03 Y:1996 03 1996 USE OPTIMUM THICKNESS INSULATION $12,771 $37,950 Implemented
OK0491 # 07 Y:1996 07 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $109 $62 Implemented
OK0491 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $234 $400 Implemented
OK0468 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $964 $2,998 Implemented
OK0468 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,638 $7,000 Implemented
OK0468 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18 $20 Implemented
OK0460 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $894 $1,344 Implemented
OK0460 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $607 $4,300 Implemented
OK0460 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,696 $120 Implemented
OK0460 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,274 $5,044 Implemented
OK0442 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $638 $1,443 Implemented
OK0442 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $757 $714 Implemented
OK0442 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,944 $60 Implemented