Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0535 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $195 $0 Not Implemented
OK0535 # 05 Y:1997 05 1997 REDUCE SCRAP PRODUCTION $17,171 $3,995 Not Implemented
OK0535 # 04 Y:1997 04 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,050 $0 Not Implemented
OK0535 # 03 Y:1997 03 1997 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $4,256 $6,500 Implemented
OK0535 # 02 Y:1997 02 1997 INSTALL EFFICIENT RECTIFIERS $1,114 $2,963 Implemented
OK0535 # 01 Y:1997 01 1997 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $15,799 $0 Not Implemented
OK0526 # 02 Y:1997 02 1997 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $5,426 $11,087 Implemented
OK0526 # 06 Y:1997 06 1997 INSULATE BARE EQUIPMENT $275 $363 Implemented
OK0526 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,323 $4,055 Implemented
OK0526 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,086 $2,477 Implemented
OK0526 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,291 $3,370 Implemented
OK0526 # 01 Y:1997 01 1997 $17,788 $6,950 Not Implemented
OK0522 # 01 Y:1997 01 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $844 $2,845 Implemented
OK0522 # 02 Y:1997 02 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,918 $3,500 Implemented
OK0522 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $103 $200 Implemented
OK0522 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-70 $386 Implemented
OK0522 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $282 $880 Not Implemented
OK0522 # 06 Y:1997 06 1997 RECOVER AND REUSE WASTE MATERIAL $54,126 $4,480 Not Implemented
OK0522 # 07 Y:1997 07 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $198 $0 Not Implemented
OK0522 # 08 Y:1997 08 1997 $10,400 $200 Implemented
OK0522 # 09 Y:1997 09 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,662 $15,500 Not Implemented