Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

186

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0580 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $611 $0 Implemented
OK0580 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,082 $98,500 Not Implemented
OK0580 # 02 Y:1999 02 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $24,960 $80,000 Not Implemented
OK0580 # 04 Y:1999 04 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $840 $0 Implemented
OK0580 # 03 Y:1999 03 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $35,280 $140,000 Not Implemented
OK0587 # 04 Y:1999 04 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,795 $0 n/a
OK0587 # 07 Y:1999 07 1999 INSULATE BARE EQUIPMENT $252 $1,028 n/a
OK0587 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,905 $0 n/a
OK0587 # 01 Y:1999 01 1999 INSTALL SYSTEM TO COLLECT SCRAP $20,078 $2,250 n/a
OK0587 # 03 Y:1999 03 1999 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $7,398 $31,705 n/a
OK0587 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $250 $525 n/a
OK0587 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,193 $3,150 n/a
OK0587 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $891 $24 n/a
OK0586 # 06 Y:1999 06 1999 IMPROVE SPACE COMFORT CONDITIONING $22,750 $50,000 Implemented
OK0586 # 04 Y:1999 04 1999 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $14,440 $30,000 Implemented
OK0586 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,681 $1,000 Implemented
OK0586 # 05 Y:1999 05 1999 MOVE PRODUCT USING MECHANICAL MEANS $81,900 $50,000 Not Implemented
OK0586 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,117 $6,500 Implemented
OK0586 # 01 Y:1999 01 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,100 $7,000 Not Implemented
OK0585 # 06 Y:1999 06 1999 INSTALL SET-BACK TIMERS $507 $260 n/a
OK0585 # 08 Y:1999 08 1999 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $147,498 $25,000 n/a
OK0585 # 07 Y:1999 07 1999 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $45,623 $17,000 n/a
OK0585 # 01 Y:1999 01 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,155 $2,668 n/a
OK0585 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $360 n/a
OK0585 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,121 $1,162 n/a