Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0615 # 10 Y:2001 10 2001 REPLACE BOILER $7,761 $22,000 Not Implemented
OK0615 # 06 Y:2001 06 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,998 $6,000 Not Implemented
OK0615 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $536 $163 Implemented
OK0615 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,798 $913 Not Implemented
OK0615 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,895 $5,476 Implemented
OK0615 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,844 $585 Implemented
OK0615 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $3,788 $250 Implemented
OK0615 # 05 Y:2001 05 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,147 $238 Not Implemented
OK0615 # 09 Y:2001 09 2001 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $13,745 $240 Implemented
OK0615 # 08 Y:2001 08 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $20,688 $8,572 Not Implemented
OK0630 # 04 Y:2001 04 2001 INSTALL SET-BACK TIMERS $11,800 $3,370 Implemented
OK0630 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,542 $1,800 Not Implemented
OK0630 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,953 $300 Implemented
OK0630 # 05 Y:2001 05 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $28,600 $5,000 Not Implemented
OK0630 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,400 $0 Not Implemented
OK0630 # 06 Y:2001 06 2001 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $115,000 $180,000 Not Implemented
OK0630 # 03 Y:2001 03 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,994 $3,700 Implemented
OK0632 # 08 Y:2001 08 2001 MOVE PRODUCT USING MECHANICAL MEANS $19,500 $2,500 Implemented
OK0632 # 09 Y:2001 09 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $19,500 $2,305 Not Implemented
OK0632 # 06 Y:2001 06 2001 MOVE PRODUCT USING MECHANICAL MEANS $11,700 $2,112 Implemented
OK0632 # 04 Y:2001 04 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $936 $0 Implemented
OK0632 # 05 Y:2001 05 2001 INSTALL SET-BACK TIMERS $3,073 $940 Implemented
OK0632 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $451 $2,456 Implemented
OK0632 # 02 Y:2001 02 2001 INSTALL SET-BACK TIMERS $2,867 $250 Not Implemented
OK0632 # 07 Y:2001 07 2001 MODIFY WORKLOAD $1,800 $0 Implemented