IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0717 # 01 Y:2005 01 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,551 $53,370 Implemented
OK0717 # 02 Y:2005 02 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,162 $7,760 Not Implemented
OK0717 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,466 $1,039 Implemented
OK0717 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,658 $461 Not Implemented
OK0717 # 05 Y:2005 05 2005 DEVELOP A REPAIR/REPLACE POLICY $1,002 $9,712 Implemented
OK0717 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $111 $417 Not Implemented
OK0716 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $579 $25 Not Implemented
OK0716 # 02 Y:2005 02 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,900 $200 Not Implemented
OK0716 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $1,725 $125 Not Implemented
OK0716 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $212 $475 Not Implemented
OK0716 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $10,863 $38,544 Not Implemented
OK0716 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $153 $1,346 Not Implemented
OK0716 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $-28,676 $0 Not Implemented
OK0715 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,111 $918 Not Implemented
OK0715 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,522 $5,175 Not Implemented
OK0715 # 06 Y:2005 06 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,022 $608 Not Implemented
OK0715 # 07 Y:2005 07 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $472 $1,000 Not Implemented
OK0715 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,665 $47,100 Not Implemented
OK0715 # 01 Y:2005 01 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,938 $3,936 Not Implemented
OK0715 # 04 Y:2005 04 2005 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $804 $1,825 Not Implemented
OK0715 # 08 Y:2005 08 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,361 $26,590 Not Implemented
OK0715 # 09 Y:2005 09 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $20,968 $0 Not Implemented
OK0714 # 04 Y:2005 04 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,299 $70 Implemented
OK0714 # 01 Y:2005 01 2005 USE POWER DURING OFF-PEAK PERIODS $1,866 $0 Not Implemented
OK0714 # 06 Y:2005 06 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $70,215 $3,931 Not Implemented