IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0798 # 10 Y:2010 10 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,239 $11,718 Not Implemented
OK0798 # 09 Y:2010 09 2010 INSTALL SET-BACK TIMERS $3,115 $1,503 Not Implemented
OK0798 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $8,199 $2,430 Implemented
OK0798 # 06 Y:2010 06 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,240 $0 Implemented
OK0798 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,000 $0 Implemented
OK0796 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $851 $217 Not Implemented
OK0796 # 08 Y:2010 08 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $786 $1,850 Implemented
OK0796 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,383 $500 Implemented
OK0796 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,660 $1,378 Not Implemented
OK0796 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,129 $5,526 Implemented
OK0796 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,028 $14,578 Implemented
OK0796 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $16,798 $29,735 Not Implemented
OK0796 # 07 Y:2010 07 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,028 $23,000 Not Implemented
OK0795 # 07 Y:2010 07 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $896 $5,000 Implemented
OK0795 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,244 $11,715 Not Implemented
OK0795 # 01 Y:2010 01 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $41,350 $68,550 Not Implemented
OK0795 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,321 $4,015 Not Implemented
OK0795 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,567 $513 Not Implemented
OK0795 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,677 $1,100 Implemented
OK0795 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,260 $159,982 Not Implemented
OK0795 # 08 Y:2010 08 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,751 $1,680 Implemented
OK0795 # 09 Y:2010 09 2010 INSTALL REPLACEMENT DOORS $24,009 $51,300 Not Implemented
OK0792 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $1,160 $11,630 Not Implemented
OK0792 # 06 Y:2010 06 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $741 $644 Implemented
OK0792 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,543 $3,114 Implemented