3,328
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0754 # 02 Y:2022 | 02 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,033 | $3,560 | n/a |
OR0754 # 03 Y:2022 | 03 | 2022 | FILTER AND REUSE HYDRAULIC OIL | $13,859 | $65,000 | n/a |
OR0754 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,871 | $2,675 | n/a |
ORC001 # 04 Y:2022 | 04 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,439 | $6,750 | n/a |
ORC001 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $455 | $1,200 | n/a |
ORC001 # 03 Y:2022 | 03 | 2022 | REDUCE VENTILATION AIR | $3,194 | $300 | n/a |
ORC001 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,145 | $29,612 | n/a |
OR0753 # 01 Y:2022 | 01 | 2022 | MODIFY CURRENT INCENTIVE PROGRAM | $1,000 | $0 | n/a |
OR0753 # 02 Y:2022 | 02 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $9,938 | $40,624 | n/a |
OR0753 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,927 | $278,534 | n/a |
OR0752 # 01 Y:2022 | 01 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,404 | $321 | n/a |
OR0752 # 02 Y:2022 | 02 | 2022 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $6,067 | $14,203 | n/a |
OR0752 # 03 Y:2022 | 03 | 2022 | SELL COMBUSTIBLE WASTE | $482,170 | $1,896,000 | n/a |
OR0751 # 03 Y:2022 | 03 | 2022 | FILTER AND REUSE HYDRAULIC OIL | $74,774 | $48,589 | n/a |
OR0751 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,956 | $1,175 | n/a |
OR0751 # 01 Y:2022 | 01 | 2022 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $12,526 | $140 | n/a |
OR0751 # 04 Y:2022 | 04 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,125 | $1,272 | n/a |
OR0750 # 03 Y:2022 | 03 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $32,591 | $4,338 | n/a |
OR0750 # 04 Y:2022 | 04 | 2022 | INCREASE USE OF AUTOMATION | $149,543 | $65,909 | n/a |
OR0750 # 02 Y:2022 | 02 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,128 | $0 | n/a |
OR0750 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,607 | $0 | n/a |
OR0750 # 06 Y:2022 | 06 | 2022 | OPTIMIZE PLANT POWER FACTOR | $49,792 | $155,954 | n/a |
OR0750 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $87,087 | $87,086 | n/a |
OR0747 # 02 Y:2022 | 02 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,708 | $7,587 | n/a |
OR0747 # 03 Y:2022 | 03 | 2022 | UPGRADE OBSOLETE EQUIPMENT | $57,063 | $757,015 | n/a |