Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,618
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0807 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,168 | $10,530 | n/a |
OR0807 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $753 | $2,323 | n/a |
OR0807 # 04 Y:2025 | 04 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,635 | $16,079 | n/a |
OR0807 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,721 | $7,534 | n/a |
ORC017 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $1,025 | $2,274 | n/a |
ORC017 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $52 | $250 | n/a |
ORC017 # 04 Y:2025 | 04 | 2025 | REDUCE VENTILATION AIR | $742 | $5,000 | n/a |
ORC017 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,320 | $35,497 | n/a |
OR0806 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $3,880 | $211 | n/a |
OR0806 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,490 | $1,927 | n/a |
OR0806 # 05 Y:2025 | 05 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $15,683 | $76,301 | n/a |
OR0806 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,542 | $5,699 | n/a |
OR0806 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,788 | $960,069 | n/a |
OR0805 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $928 | $0 | n/a |
OR0805 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $103,946 | $1,750,000 | n/a |
OR0805 # 05 Y:2025 | 05 | 2025 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $5,605 | $0 | n/a |
OR0805 # 01 Y:2025 | 01 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $26,892 | $0 | n/a |
OR0805 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,651 | $2,361 | n/a |
OR0805 # 02 Y:2025 | 02 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,187 | $0 | n/a |
ORC016 # 04 Y:2025 | 04 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $838 | $7,000 | n/a |
ORC016 # 03 Y:2025 | 03 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $90,790 | $266,383 | n/a |
ORC016 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,757 | $18,123 | n/a |
ORC016 # 02 Y:2025 | 02 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $14,324 | $1,894 | n/a |
OR0804 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,678 | $51,877 | Not Implemented |
OR0804 # 02 Y:2024 | 02 | 2024 | INCREASE EFFICIENCY OF TRUCKS | $473,339 | $1,593,482 | Not Implemented |