Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

110

matching recommendations
Reset
NAICS 321212 Softwood Veneer and Plywood Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0456 # 02 Y:2004 02 2004 KEEP BOILER TUBES CLEAN $37,240 $1,760 Not Implemented
OR0456 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $12,900 $2,410 Not Implemented
OR0456 # 04 Y:2004 04 2004 OPTIMIZE PLANT POWER FACTOR $4,900 $12,600 Not Implemented
OR0456 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,550 $15,400 Implemented
OR0453 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,340 $150 Not Implemented
OR0453 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $10,100 $2,950 Not Implemented
OR0453 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,680 $6,920 Not Implemented
OR0453 # 04 Y:2004 04 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $113,000 $84,300 Not Implemented
OR0453 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,300 $9,460 Not Implemented
OR0453 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,400 $6,400 Not Implemented
OR0453 # 07 Y:2004 07 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $11,370 $1,000 Not Implemented
OR0453 # 08 Y:2004 08 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,780 $6,900 Not Implemented
OR0453 # 09 Y:2004 09 2004 OPTIMIZE PLANT POWER FACTOR $3,020 $4,500 Not Implemented
OR0447 # 01 Y:2003 01 2003 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $105,200 $7,000 Implemented
OR0447 # 02 Y:2003 02 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $43,500 $4,910 Not Implemented
OR0447 # 03 Y:2003 03 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $28,720 $150 Implemented
OR0447 # 04 Y:2003 04 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $2,460 $880 Implemented
OR0430 # 01 Y:2003 01 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $119,450 $176,200 Not Implemented
OR0430 # 02 Y:2003 02 2003 MOVE PRODUCT USING MECHANICAL MEANS $129,340 $12,250 Not Implemented
OR0430 # 03 Y:2003 03 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $11,900 $9,300 Not Implemented
OR0430 # 04 Y:2003 04 2003 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $30,700 $17,700 Implemented
OR0430 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,810 $9,000 Implemented
OR0430 # 06 Y:2003 06 2003 UPGRADE CONTROLS ON COMPRESSORS $11,350 $2,000 Implemented
OR0430 # 07 Y:2003 07 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,950 $3,100 Not Implemented
OR0430 # 08 Y:2003 08 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $8,830 $14,600 Implemented