IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0541 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,123 $8,200 Not Implemented
OR0541 # 01 Y:2008 01 2008 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $277,000 $77,500 Implemented
OR0534 # 01 Y:2008 01 2008 $47,698 $19,250 Not Implemented
OR0534 # 02 Y:2008 02 2008 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $7,700 $167,953 Not Implemented
OR0534 # 10 Y:2008 10 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $447 $808 Implemented
OR0534 # 03 Y:2008 03 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,794 $0 Implemented
OR0534 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $6,768 $6,825 Implemented
OR0534 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $271 $0 Implemented
OR0534 # 06 Y:2008 06 2008 UPGRADE CONTROLS ON COMPRESSORS $1,203 $0 Not Implemented
OR0534 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $127 $125 Not Implemented
OR0534 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $1,219 $2,510 Implemented
OR0534 # 09 Y:2008 09 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $829 $2,700 Not Implemented
OR0532 # 05 Y:2008 05 2008 OPTIMIZE PLANT POWER FACTOR $13,750 $20,650 Not Implemented
OR0532 # 01 Y:2008 01 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,033 $400 Not Implemented
OR0532 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,101 $2,697 Not Implemented
OR0532 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $4,068 $13,244 Not Implemented
OR0532 # 04 Y:2008 04 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $27,532 $49,504 Not Implemented
OR0532 # 06 Y:2008 06 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $1,195 $0 Not Implemented
OR0455 # 06 Y:2004 06 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,510 $790 Not Implemented
OR0455 # 05 Y:2004 05 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,420 $150 Implemented
OR0455 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $2,140 $1,750 Implemented
OR0455 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,670 $6,670 Not Implemented
OR0455 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,570 $0 Implemented
OR0455 # 01 Y:2004 01 2004 RECOVER AND REUSE WASTE MATERIAL $45,100 $16,200 Implemented