IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

394

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0371 # 03 Y:2000 03 2000 $142,687 $81,200 Not Implemented
OR0371 # 04 Y:2000 04 2000 INCREASE USE OF AUTOMATION $25,665 $2,234 Not Implemented
OR0360 # 01 Y:1999 01 1999 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $9,585 $2,840 Implemented
OR0360 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,909 $0 Implemented
OR0360 # 03 Y:1999 03 1999 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $6,248 $20,000 Not Implemented
OR0360 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $18,785 $67,680 Not Implemented
OR0360 # 05 Y:1999 05 1999 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $17,520 $2,000 Implemented
OR0311 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $112,722 $650,500 Not Implemented
OR0311 # 02 Y:1998 02 1998 USE OPTIMUM THICKNESS INSULATION $1,740 $4,421 Not Implemented
OR0311 # 03 Y:1998 03 1998 OPTIMIZE PLANT POWER FACTOR $8,062 $21,202 Not Implemented
OR0311 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,341 $20,064 Implemented
OR0311 # 05 Y:1998 05 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,035 $0 Implemented
OR0311 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,008 $1,514 Not Implemented
OR0311 # 07 Y:1998 07 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $273 $0 Implemented
OR0311 # 08 Y:1998 08 1998 KEEP BOILER TUBES CLEAN $1,431 $1,500 Not Implemented
OR0311 # 09 Y:1998 09 1998 MINIMIZE WATER USAGE $1,020 $0 Not Implemented
OR0311 # 10 Y:1998 10 1998 MINIMIZE WATER USAGE $275 $0 Not Implemented
OR0286 # 01 Y:1997 01 1997 BURN WOOD BY-PRODUCTS FOR HEAT $907 $0 Implemented
OR0286 # 02 Y:1997 02 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,123 $16,000 Not Implemented
OR0286 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $459 $1,538 Not Implemented
OR0285 # 01 Y:1996 01 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $33,432 $0 Implemented
OR0285 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $464 $142 Implemented
OR0285 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $36,382 $10,450 Implemented
OR0285 # 04 Y:1996 04 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,815 $0 Not Implemented
OR0285 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,671 $15,663 Implemented