IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,505

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0007 # 10 Y:1987 10 1987 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $49 $80 Not Implemented
OR0007 # 11 Y:1987 11 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,933 $8,957 Not Implemented
OR0008 # 01 Y:1987 01 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $551 $0 Implemented
OR0008 # 02 Y:1987 02 1987 INSTALL SET-BACK TIMERS $2,187 $100 Not Implemented
OR0008 # 03 Y:1987 03 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $729 $80 Not Implemented
OR0008 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $334 $100 Implemented
OR0008 # 05 Y:1987 05 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,408 $705 Not Implemented
OR0008 # 06 Y:1987 06 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,949 $1,000 Implemented
OR0008 # 07 Y:1987 07 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $882 $609 Not Implemented
OR0008 # 08 Y:1987 08 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $159 $128 Not Implemented
OR0008 # 09 Y:1987 09 1987 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,901 $6,627 Not Implemented
OR0008 # 10 Y:1987 10 1987 INSULATE BARE EQUIPMENT $2,608 $2,691 Implemented
OR0005 # 01 Y:1987 01 1987 USE MINIMUM STEAM OPERATING PRESSURE $1,499 $0 Implemented
OR0005 # 02 Y:1987 02 1987 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $581 $0 Not Implemented
OR0005 # 03 Y:1987 03 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,003 $0 Implemented
OR0005 # 04 Y:1987 04 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,654 $300 Implemented
OR0005 # 05 Y:1987 05 1987 USE RADIANT HEATER FOR SPOT HEATING $1,964 $1,740 Not Implemented
OR0005 # 06 Y:1987 06 1987 OPTIMIZE PLANT POWER FACTOR $3,642 $3,325 Implemented
OR0005 # 07 Y:1987 07 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,190 $1,201 Not Implemented
OR0005 # 08 Y:1987 08 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,287 $900 Implemented
OR0002 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,190 $300 Implemented
OR0002 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,568 $550 Not Implemented
OR0002 # 03 Y:1987 03 1987 MINIMIZE WATER USAGE $1,082 $300 Not Implemented
OR0002 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,563 $4,730 Not Implemented
OR0002 # 05 Y:1987 05 1987 OPTIMIZE PLANT POWER FACTOR $4,962 $7,398 Implemented