IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0074 # 01 Y:1989 01 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $171 $223 Implemented
OR0074 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $200 $250 Implemented
OR0075 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $228 $213 Implemented
OR0075 # 07 Y:1989 07 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $131 $244 Implemented
OR0075 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $78 $94 Implemented
OR0075 # 05 Y:1989 05 1989 RECOVER WASTE HEAT FROM EQUIPMENT $925 $1,340 Not Implemented
OR0074 # 03 Y:1989 03 1989 OPTIMIZE PLANT POWER FACTOR $498 $1,125 Implemented
OR0075 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $147 $117 Not Implemented
OR0075 # 06 Y:1989 06 1989 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $833 $1,175 Implemented
OR0074 # 02 Y:1989 02 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,200 $2,400 Not Implemented
OR0075 # 01 Y:1989 01 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $794 $500 Implemented
OR0070 # 04 Y:1989 04 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,766 $0 Implemented
OR0073 # 03 Y:1989 03 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,597 $0 Implemented
OR0073 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $770 $1,000 Implemented
OR0070 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN WATER LINES AND VALVES $12,697 $2,400 Implemented
OR0073 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $797 $150 Not Implemented
OR0071 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $106 $181 Implemented
OR0071 # 04 Y:1989 04 1989 OPTIMIZE PLANT POWER FACTOR $900 $2,250 Not Implemented
OR0073 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,024 $2,931 Implemented
OR0072 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $76 $50 Not Implemented
OR0070 # 01 Y:1989 01 1989 ELIMINATE LEAKS IN WATER LINES AND VALVES $13,228 $2,500 Implemented
OR0070 # 03 Y:1989 03 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,909 $1,090 Implemented
OR0071 # 05 Y:1989 05 1989 REDUCE FLUID FLOW RATES $4,615 $12,560 Implemented
OR0072 # 01 Y:1989 01 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $134 $200 Implemented
OR0073 # 07 Y:1989 07 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,207 $2,980 Not Implemented