Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
166
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0165 # 01 Y:1992 | 01 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $4,045 | $500 | Implemented |
OR0165 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,356 | $0 | Not Implemented |
OR0165 # 06 Y:1992 | 06 | 1992 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $320 | $824 | Implemented |
OR0165 # 05 Y:1992 | 05 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $830 | $0 | Implemented |
OR0165 # 02 Y:1992 | 02 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,788 | $0 | Implemented |
OR0165 # 04 Y:1992 | 04 | 1992 | OPTIMIZE PLANT POWER FACTOR | $1,074 | $2,250 | Implemented |
OR0164 # 06 Y:1992 | 06 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,419 | $0 | Not Implemented |
OR0164 # 02 Y:1992 | 02 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,608 | $0 | Implemented |
OR0164 # 01 Y:1992 | 01 | 1992 | OPERATE BOILERS ON HIGH FIRE SETTING | $3,115 | $0 | Not Implemented |
OR0164 # 05 Y:1992 | 05 | 1992 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,127 | $4,466 | Implemented |
OR0164 # 04 Y:1992 | 04 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,042 | $500 | Implemented |
OR0164 # 03 Y:1992 | 03 | 1992 | RECOVER MECHANICAL ENERGY | $929 | $0 | Implemented |
OR0163 # 03 Y:1992 | 03 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,260 | $4,000 | Implemented |
OR0163 # 04 Y:1992 | 04 | 1992 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $676 | $1,436 | Implemented |
OR0163 # 05 Y:1992 | 05 | 1992 | RECOVER MECHANICAL ENERGY | $300 | $850 | Not Implemented |
OR0163 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $349 | $0 | Implemented |
OR0163 # 02 Y:1992 | 02 | 1992 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,832 | $360 | Implemented |
OR0163 # 01 Y:1992 | 01 | 1992 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,055 | $0 | Implemented |
OR0162 # 06 Y:1992 | 06 | 1992 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $26,207 | $150,000 | Implemented |
OR0162 # 01 Y:1992 | 01 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $289 | $0 | Not Implemented |
OR0162 # 05 Y:1992 | 05 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $4,388 | $14,272 | Not Implemented |
OR0162 # 03 Y:1992 | 03 | 1992 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $524 | $750 | Implemented |
OR0162 # 02 Y:1992 | 02 | 1992 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,784 | $2,920 | Implemented |
OR0162 # 07 Y:1992 | 07 | 1992 | REDESIGN PROCESS | $15,590 | $130,000 | Not Implemented |
OR0162 # 04 Y:1992 | 04 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,666 | $5,359 | Implemented |