IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

166

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0165 # 01 Y:1992 01 1992 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $4,045 $500 Implemented
OR0165 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $0 Not Implemented
OR0165 # 06 Y:1992 06 1992 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $320 $824 Implemented
OR0165 # 05 Y:1992 05 1992 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $830 $0 Implemented
OR0165 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,788 $0 Implemented
OR0165 # 04 Y:1992 04 1992 OPTIMIZE PLANT POWER FACTOR $1,074 $2,250 Implemented
OR0164 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,419 $0 Not Implemented
OR0164 # 02 Y:1992 02 1992 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,608 $0 Implemented
OR0164 # 01 Y:1992 01 1992 OPERATE BOILERS ON HIGH FIRE SETTING $3,115 $0 Not Implemented
OR0164 # 05 Y:1992 05 1992 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,127 $4,466 Implemented
OR0164 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,042 $500 Implemented
OR0164 # 03 Y:1992 03 1992 RECOVER MECHANICAL ENERGY $929 $0 Implemented
OR0163 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,260 $4,000 Implemented
OR0163 # 04 Y:1992 04 1992 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $676 $1,436 Implemented
OR0163 # 05 Y:1992 05 1992 RECOVER MECHANICAL ENERGY $300 $850 Not Implemented
OR0163 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $0 Implemented
OR0163 # 02 Y:1992 02 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,832 $360 Implemented
OR0163 # 01 Y:1992 01 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,055 $0 Implemented
OR0162 # 06 Y:1992 06 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $26,207 $150,000 Implemented
OR0162 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $289 $0 Not Implemented
OR0162 # 05 Y:1992 05 1992 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $4,388 $14,272 Not Implemented
OR0162 # 03 Y:1992 03 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $524 $750 Implemented
OR0162 # 02 Y:1992 02 1992 TURN OFF EQUIPMENT WHEN NOT IN USE $5,784 $2,920 Implemented
OR0162 # 07 Y:1992 07 1992 REDESIGN PROCESS $15,590 $130,000 Not Implemented
OR0162 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,666 $5,359 Implemented