Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,774
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0806 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,542 | $5,699 | n/a |
OR0806 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $3,880 | $211 | n/a |
OR0806 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,788 | $960,069 | n/a |
OR0806 # 05 Y:2025 | 05 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $15,683 | $76,301 | n/a |
OR0806 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,490 | $1,927 | n/a |
OR0805 # 05 Y:2025 | 05 | 2025 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $5,605 | $0 | n/a |
OR0805 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,157 | $3,706 | n/a |
OR0805 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $103,946 | $1,750,000 | n/a |
OR0805 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $928 | $0 | n/a |
OR0805 # 01 Y:2025 | 01 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $26,892 | $0 | n/a |
OR0805 # 02 Y:2025 | 02 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,187 | $0 | n/a |
ORC016 # 02 Y:2025 | 02 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $14,324 | $1,894 | n/a |
ORC016 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,757 | $18,123 | n/a |
ORC016 # 04 Y:2025 | 04 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $838 | $7,000 | n/a |
ORC016 # 03 Y:2025 | 03 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $90,790 | $266,383 | n/a |
OR0803 # 03 Y:2024 | 03 | 2024 | USE OPTIMUM TEMPERATURE | $6,284 | $0 | n/a |
OR0803 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $6,565 | $7,289 | n/a |
OR0803 # 05 Y:2024 | 05 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,591 | $3,426 | n/a |
OR0803 # 01 Y:2024 | 01 | 2024 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $79,249 | $259,200 | n/a |
OR0803 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $1,811 | $4,166 | n/a |
OR0803 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,111 | $0 | n/a |
OR0802 # 04 Y:2024 | 04 | 2024 | REPLACE BOILER | $37,073 | $222,038 | n/a |
OR0802 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,248 | $147 | n/a |
OR0802 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $2,952 | $500 | n/a |
OR0802 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,483 | $499 | n/a |