IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0447 # 04 Y:2003 04 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $2,460 $880 Implemented
OR0447 # 01 Y:2003 01 2003 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $105,200 $7,000 Implemented
OR0447 # 02 Y:2003 02 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $43,500 $4,910 Not Implemented
OR0447 # 03 Y:2003 03 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $28,720 $150 Implemented
OR0446 # 05 Y:2003 05 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,050 $98,000 Not Implemented
OR0446 # 02 Y:2003 02 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,000 $8,100 Implemented
OR0446 # 06 Y:2003 06 2003 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,780 $26,000 Implemented
OR0446 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,100 $13,000 Implemented
OR0446 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,800 $21,600 Implemented
OR0446 # 01 Y:2003 01 2003 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $508,000 $28,000 Not Implemented
OR0445 # 03 Y:2003 03 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,778 $150 Implemented
OR0445 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,960 $0 Not Implemented
OR0445 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,505 $0 Not Implemented
OR0445 # 06 Y:2003 06 2003 OPTIMIZE PLANT POWER FACTOR $5,690 $20,000 Not Implemented
OR0445 # 01 Y:2003 01 2003 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $123,700 $303,000 n/a
OR0445 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,860 $5,450 Implemented
OR0444 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $967,810 $181,200 Implemented
OR0444 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,600 $18,610 Not Implemented
OR0444 # 02 Y:2003 02 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $30,800 $2,000 Not Implemented
OR0444 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,210 $8,170 Implemented
OR0443 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $5,950 $16,800 n/a
OR0443 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $14,000 $0 Not Implemented
OR0443 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,080 $10,100 Implemented
OR0443 # 06 Y:2003 06 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,770 $665 Implemented
OR0443 # 02 Y:2003 02 2003 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $46,744 $15,000 Not Implemented