IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0730 # 01 Y:2019 01 2019 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $15,651 $5,000 Not Implemented
OR0730 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $2,657 $9,364 Not Implemented
OR0730 # 02 Y:2019 02 2019 MODIFY WORKLOAD $13,223 $18,824 Not Implemented
OR0730 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,030 $2,058 Not Implemented
OR0730 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,201 $0 Not Implemented
OR0729 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,586 $8,701 Not Implemented
OR0729 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,791 $13,791 Implemented
OR0729 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,737 $17,500 Not Implemented
OR0729 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $14,812 $38,672 Implemented
OR0729 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $34,870 $566,544 Not Implemented
OR0728 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,008 $0 Implemented
OR0728 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,174 $4,152 Not Implemented
OR0728 # 02 Y:2019 02 2019 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $29,427 $34,054 Not Implemented
OR0728 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,023 $34,574 Not Implemented
OR0727 # 01 Y:2019 01 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,245,906 $300,000 Not Implemented
OR0727 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,255 $770 Implemented
OR0727 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,870 $19,006 Implemented
OR0727 # 02 Y:2019 02 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $125,609 $904,500 Not Implemented
OR0726 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $3,031 $3,570 Not Implemented
OR0726 # 02 Y:2019 02 2019 REDUCE VENTILATION AIR $1,259 $0 Implemented
OR0726 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,581 $7,570 Implemented
OR0725 # 01 Y:2019 01 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $16,581 $12,780 Not Implemented
OR0725 # 04 Y:2019 04 2019 REPLACE BOILER $2,159 $0 Not Implemented
OR0725 # 03 Y:2019 03 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $126,211 $375,000 Implemented
OR0725 # 02 Y:2019 02 2019 RECOVER AND REUSE WASTE MATERIAL $58,445 $110,790 Implemented