IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0122 # 09 Y:1991 09 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $150 $462 Implemented
OR0120 # 01 Y:1991 01 1991 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,060 $2,900 Not Implemented
OR0120 # 02 Y:1991 02 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,938 $3,000 Not Implemented
OR0120 # 03 Y:1991 03 1991 OPTIMIZE PLANT POWER FACTOR $1,000 $1,425 Not Implemented
OR0120 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $113 $226 Not Implemented
OR0120 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $50 $1,095 Not Implemented
OR0118 # 01 Y:1991 01 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,432 $0 Implemented
OR0118 # 02 Y:1991 02 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,838 $0 Implemented
OR0118 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $3,367 $3,124 Implemented
OR0118 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $383 $919 Implemented
OR0118 # 05 Y:1991 05 1991 OPTIMIZE PLANT POWER FACTOR $2,040 $5,100 Implemented
OR0118 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $1,177 Implemented
OR0119 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $30,780 $600 Not Implemented
OR0119 # 02 Y:1991 02 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,126 $2,580 Not Implemented
OR0119 # 03 Y:1991 03 1991 INSULATE FEEDWATER TANK $553 $496 Not Implemented
OR0119 # 04 Y:1991 04 1991 OPTIMIZE PLANT POWER FACTOR $13,571 $12,150 Not Implemented
OR0119 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,373 $6,000 Not Implemented
OR0119 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,080 $0 Not Implemented
OR0119 # 07 Y:1991 07 1991 REDUCE FLUID FLOW RATES $5,381 $12,545 Not Implemented
OR0119 # 08 Y:1991 08 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,268 $4,135 Not Implemented
OR0119 # 09 Y:1991 09 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,630 $8,930 Not Implemented
OR0119 # 10 Y:1991 10 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,296 $14,125 Not Implemented
OR0116 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,056 $776 Implemented
OR0116 # 02 Y:1991 02 1991 MINIMIZE WATER USAGE $1,728 $0 Not Implemented
OR0116 # 03 Y:1991 03 1991 HEAT WATER WITH EXHAUST HEAT $11,470 $4,720 Implemented