Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0549 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,263 | $11,180 | Implemented |
WV0549 # 17 Y:2017 | 17 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $286 | $1,075 | Implemented |
WV0549 # 16 Y:2017 | 16 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $308 | $20 | Implemented |
WV0549 # 15 Y:2017 | 15 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $527 | $2,000 | Implemented |
WV0549 # 14 Y:2017 | 14 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $1,016 | $582 | Implemented |
WV0549 # 13 Y:2017 | 13 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,249 | $75 | Implemented |
WV0549 # 10 Y:2017 | 10 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,680 | $500 | Implemented |
WV0549 # 09 Y:2017 | 09 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,755 | $0 | Implemented |
UD0969 # 11 Y:2017 | 11 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,502 | $844 | Implemented |
UD0969 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,419 | $1,000 | Implemented |
UD0969 # 01 Y:2017 | 01 | 2017 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,613 | $30 | Implemented |
UD0969 # 02 Y:2017 | 02 | 2017 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $4,357 | $30 | Implemented |
UD0969 # 09 Y:2017 | 09 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,251 | $30 | Implemented |
UD0969 # 06 Y:2017 | 06 | 2017 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $22,591 | $63,800 | Implemented |
UD0969 # 03 Y:2017 | 03 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,188 | $30 | Implemented |
UD0969 # 14 Y:2017 | 14 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,321 | $811 | Implemented |
UD0965 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,081 | $1,230 | Implemented |
UD0965 # 11 Y:2017 | 11 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $560 | $300 | Implemented |
UD0965 # 05 Y:2017 | 05 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $26,366 | $2,000 | Implemented |
UD0965 # 03 Y:2017 | 03 | 2017 | USE AUTOMATIC CLEANING EQUIPMENT | $15,770 | $0 | Implemented |
UD0965 # 10 Y:2017 | 10 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $41,935 | $20,000 | Implemented |
UD0965 # 04 Y:2017 | 04 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,437 | $700 | Implemented |
UD0965 # 09 Y:2017 | 09 | 2017 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $5,101 | $0 | Implemented |
UD0952 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,722 | $0 | Implemented |
UD0952 # 01 Y:2016 | 01 | 2016 | COMBINE UTILITY METERS | $26,792 | $0 | Implemented |