Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0880 # 02 Y:2013 | 02 | 2013 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,784 | $5,000 | Implemented |
UD0880 # 15 Y:2013 | 15 | 2013 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $6,830 | $0 | Implemented |
UD0880 # 14 Y:2013 | 14 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,352 | $0 | Implemented |
UD0880 # 13 Y:2013 | 13 | 2013 | INSULATE BARE EQUIPMENT | $3,572 | $1,221 | Implemented |
UD0880 # 12 Y:2013 | 12 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,170 | $8,000 | Implemented |
UD0880 # 11 Y:2013 | 11 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,315 | $8,000 | Implemented |
UD0880 # 10 Y:2013 | 10 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,091 | $25,000 | Implemented |
UD0880 # 09 Y:2013 | 09 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $25,120 | $4,600 | Implemented |
UD0880 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,120 | $1,000 | Implemented |
UD0880 # 06 Y:2013 | 06 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $12,462 | $0 | Implemented |
UD0880 # 05 Y:2013 | 05 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,656 | $0 | Implemented |
UD0880 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,196 | $3,400 | Implemented |
UD0880 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,581 | $15,000 | Implemented |
UD0880 # 01 Y:2013 | 01 | 2013 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $37,553 | $100,000 | Not Implemented |
UD0880 # 08 Y:2013 | 08 | 2013 | REDUCE EXCESSIVE BOILER BLOWDOWN | $35,463 | $15,000 | Implemented |
UD0877 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,981 | $14,250 | Not Implemented |
UD0877 # 09 Y:2013 | 09 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $685 | $2,000 | Implemented |
UD0877 # 08 Y:2013 | 08 | 2013 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $61,182 | $25,000 | Implemented |
UD0877 # 07 Y:2013 | 07 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $262 | $500 | Not Implemented |
UD0877 # 06 Y:2013 | 06 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,095 | $0 | Implemented |
UD0877 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,183 | $1,000 | Not Implemented |
UD0877 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,143 | $8,200 | Not Implemented |
UD0877 # 02 Y:2013 | 02 | 2013 | METER WASTE WATER | $18,660 | $1,000 | Implemented |
UD0877 # 01 Y:2013 | 01 | 2013 | ELIMINATE THIRD SHIFT | $75,782 | $0 | Implemented |
UD0874 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $23,112 | $20,000 | Not Implemented |