IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

299

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0967 # 13 Y:2017 13 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,271 $4,000 Not Implemented
UD0967 # 14 Y:2017 14 2017 MINIMIZE WATER USAGE $13,765 $6,000 Implemented
UD0967 # 15 Y:2017 15 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,735 $14,110 Not Implemented
UD0967 # 16 Y:2017 16 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $121,762 $503,900 Not Implemented
UD0967 # 17 Y:2017 17 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,764 $0 Implemented
UD0967 # 18 Y:2017 18 2017 DEVELOP A REPAIR/REPLACE POLICY $15,207 $65,253 Not Implemented
UD0967 # 19 Y:2017 19 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,773 $3,825 Not Implemented
UD0966 # 01 Y:2017 01 2017 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $217,648 $48,962 Not Implemented
UD0966 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $12,245 $25,000 Not Implemented
UD0966 # 03 Y:2017 03 2017 IMPROVE COMBUSTION CONTROL CAPABILITY $270,579 $100,000 Not Implemented
UD0966 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,225 $4,000 Not Implemented
UD0966 # 05 Y:2017 05 2017 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $57,432 $35,000 Not Implemented
UD0966 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,748 $4,000 Not Implemented
UD0966 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $383,642 $613,600 Implemented
UD0966 # 08 Y:2017 08 2017 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $229,882 $595,039 Not Implemented
UD0966 # 09 Y:2017 09 2017 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $76,595 $198,657 Not Implemented
UD0965 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,857 $0 Not Implemented
UD0965 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $303 $0 Not Implemented
UD0965 # 03 Y:2017 03 2017 USE AUTOMATIC CLEANING EQUIPMENT $15,770 $0 Implemented
UD0965 # 04 Y:2017 04 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,437 $700 Implemented
UD0965 # 05 Y:2017 05 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $26,366 $2,000 Implemented
UD0965 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,440 $80,000 Not Implemented
UD0965 # 07 Y:2017 07 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,537 $10,000 Not Implemented
UD0965 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,342 $200 Not Implemented
UD0965 # 09 Y:2017 09 2017 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $5,101 $0 Implemented