IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

353

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0411 # 07 Y:2016 07 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $1,450 $1,450 Not Implemented
LE0411 # 08 Y:2016 08 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,696 $100,000 Implemented
LE0411 # 09 Y:2016 09 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,849 $6,000 Not Implemented
LE0411 # 10 Y:2016 10 2016 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $102,584 $458,390 Not Implemented
LE0411 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,246 $16,912 Implemented
LE0411 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $22 $0 Implemented
LE0391 # 15 Y:2015 15 2015 OPTIMIZE PLANT POWER FACTOR $28 $145 Not Implemented
LE0391 # 14 Y:2015 14 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,842 $31,282 Not Implemented
LE0391 # 13 Y:2015 13 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,886 $29,120 Not Implemented
LE0391 # 12 Y:2015 12 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,982 $7,500 Implemented
LE0391 # 11 Y:2015 11 2015 UPGRADE OBSOLETE EQUIPMENT $17,674 $30,425 Not Implemented
LE0391 # 10 Y:2015 10 2015 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $119,994 $200,000 Not Implemented
LE0391 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,081 $30,500 Not Implemented
LE0391 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,985 $49,800 Not Implemented
LE0391 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $109 $75 Implemented
LE0391 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,773 $1,000 Not Implemented
LE0391 # 05 Y:2015 05 2015 USE RADIANT HEATER FOR SPOT HEATING $30,168 $12,000 Not Implemented
LE0391 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $6,982 $2,372 Implemented
LE0391 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,552 $656 Implemented
LE0391 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $703 $70 Not Implemented
LE0391 # 01 Y:2015 01 2015 REPAIR OR REPLACE STEAM TRAPS $22,916 $1,170 Implemented
WV0498 # 10 Y:2015 10 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $170 $457 Not Implemented
WV0498 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,537 $0 Not Implemented
WV0498 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,141 $19,874 Implemented
WV0498 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $5,821 $864 Implemented