IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
NAICS 312 Beverage and Tobacco Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0298 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,592 $12,000 Not Implemented
LE0298 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $327 $630 Implemented
DL0037 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $105,200 $0 Implemented
DL0037 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $644 $140 Implemented
DL0037 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,050 $5,000 Not Implemented
DL0037 # 04 Y:2009 04 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,500 $880 Not Implemented
DL0037 # 05 Y:2009 05 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,330 $8,800 Not Implemented
DL0037 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,254 $35,000 Not Implemented
LE0267 # 01 Y:2008 01 2008 $198,263 $200,000 Not Implemented
LE0267 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $41,140 $6,000 Implemented
LE0267 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,169 $30,000 Implemented
LE0267 # 04 Y:2008 04 2008 REPAIR OR REPLACE STEAM TRAPS $31,944 $2,000 Implemented
LE0267 # 05 Y:2008 05 2008 PREHEAT COMBUSTION AIR WITH WASTE HEAT $21,795 $30,000 Not Implemented
LE0267 # 06 Y:2008 06 2008 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $26,495 $31,435 Not Implemented
LE0267 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,200 $3,000 Implemented
LE0267 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,134 $1,500 Not Implemented
LE0267 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,723 $1,000 Implemented
LE0267 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,129 $300,000 Implemented
LE0262 # 01 Y:2007 01 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $204,947 $1,684,540 Not Implemented
LE0262 # 02 Y:2007 02 2007 REPAIR OR REPLACE STEAM TRAPS $427,857 $118,000 Not Implemented
LE0262 # 03 Y:2007 03 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $173,079 $300,000 Not Implemented
LE0262 # 04 Y:2007 04 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $118,106 $75,000 Not Implemented
LE0262 # 05 Y:2007 05 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $40,484 $1,000 Not Implemented
LE0262 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,726 $36,000 Not Implemented
LE0262 # 07 Y:2007 07 2007 REPAIR OR REPLACE STEAM TRAPS $16,954 $4,200 Not Implemented