IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

342

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0375 # 13 Y:2008 13 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,817 $2,000 Implemented
WV0375 # 14 Y:2008 14 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,983 $772 Implemented
WV0375 # 15 Y:2008 15 2008 UPGRADE CONTROLS ON COMPRESSORS $7,595 $4,650 Not Implemented
WV0375 # 16 Y:2008 16 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,374 $52 Implemented
WV0375 # 17 Y:2008 17 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,975 $652 Not Implemented
WV0375 # 18 Y:2008 18 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,797 $10,125 Implemented
WV0375 # 19 Y:2008 19 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,275 $0 Not Implemented
WV0375 # 04 Y:2008 04 2008 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $97,283 $434,500 Not Implemented
WV0375 # 03 Y:2008 03 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $250,246 $168,224 Implemented
WV0375 # 02 Y:2008 02 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $396,584 $183,040 Implemented
WV0375 # 01 Y:2008 01 2008 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $1,181,139 $1,147,130 Not Implemented
LE0261 # 01 Y:2007 01 2007 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $196,792 $500 Not Implemented
LE0261 # 02 Y:2007 02 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $71,526 $75,000 Not Implemented
LE0261 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,454 $12,000 Not Implemented
LE0261 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,461 $20 Implemented
LE0261 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,661 $100 Implemented
LE0261 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,137 $5,000 Not Implemented
LE0261 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,155 $1,500 Implemented
LE0261 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,476 $150 Implemented
LE0261 # 09 Y:2007 09 2007 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,985 $300 Not Implemented
LE0251 # 01 Y:2007 01 2007 USE RADIANT HEATER FOR SPOT HEATING $35,204 $3,330 Implemented
LE0251 # 02 Y:2007 02 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $21,905 $15,088 Not Implemented
LE0251 # 03 Y:2007 03 2007 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $18,340 $24,000 Implemented
LE0251 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,085 $1,000 Implemented
LE0251 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,122 $194 Implemented