IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
NAICS 3321 Forging and Stamping
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0584 # 10 Y:2019 10 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,028 $5,443 Implemented
WV0584 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $534,947 $542,300 Not Implemented
WV0584 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $72,031 $169,200 Not Implemented
WV0584 # 03 Y:2019 03 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $44,593 $129,500 Implemented
WV0584 # 04 Y:2019 04 2019 RECYCLE WHITE WATER $26,110 $17,500 Not Implemented
WV0584 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $18,530 $6,283 Implemented
WV0584 # 06 Y:2019 06 2019 DEVELOP A REPAIR/REPLACE POLICY $7,129 $675 Implemented
WV0584 # 07 Y:2019 07 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,503 $1,000 Implemented
WV0584 # 08 Y:2019 08 2019 UPGRADE CONTROLS ON COMPRESSORS $5,427 $8,500 Not Implemented
WV0584 # 09 Y:2019 09 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,899 $510 Implemented
WV0584 # 11 Y:2019 11 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $876 $358 Implemented
LE0468 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $76,637 $55,000 Implemented
LE0468 # 06 Y:2019 06 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $726,896 $16,000,000 Implemented
LE0468 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,988 $50,000 Implemented
LE0468 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,375 $186,863 Implemented
LE0468 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,956 $35,000 Not Implemented
LE0468 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $106,181 $0 Not Implemented
LE0456 # 04 Y:2018 04 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,979 $50,000 Implemented
LE0456 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $783 $3,200 Implemented
LE0456 # 06 Y:2018 06 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,041 $40,000 Implemented
LE0456 # 01 Y:2018 01 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,810 $36 Implemented
LE0456 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,319 $2,000 Not Implemented
LE0456 # 03 Y:2018 03 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,140 $3,500 Implemented
SU0454 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $631 $1,100 Implemented
SU0454 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $609 $1,336 Implemented