IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

266

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0353 # 14 Y:2007 14 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $796 $3,000 Implemented
LE0246 # 01 Y:2006 01 2006 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $66,327 $5,000 Implemented
LE0246 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,683 $6,700 Implemented
LE0246 # 05 Y:2006 05 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,033 $5,000 Implemented
LE0246 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,948 $180,000 Implemented
LE0246 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $1,586 $450 Implemented
LE0245 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,138 $2,500 Implemented
LE0245 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,828 $8,700 Implemented
LE0245 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,796 $3,000 Implemented
LE0233 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,332 $800 Implemented
LE0233 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,514 $12,000 Implemented
SU0209 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,769 $0 Implemented
SU0209 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,742 $509 Implemented
SU0209 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,683 $418 Implemented
SU0209 # 06 Y:2005 06 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $30,000 $16,000 Implemented
SU0209 # 07 Y:2005 07 2005 USE SYNTHETIC LUBRICANT $1,072 $1,000 Implemented
WV0305 # 02 Y:2004 02 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,442 $1,774 Implemented
WV0305 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,562 $221 Implemented
WV0305 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,370 $6,052 Implemented
WV0305 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,922 $1,000 Implemented
WV0305 # 06 Y:2004 06 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,458 $337 Implemented
WV0305 # 07 Y:2004 07 2004 REPAIR OR REPLACE STEAM TRAPS $2,040 $1,870 Implemented
WV0305 # 11 Y:2004 11 2004 INSULATE BARE EQUIPMENT $1,275 $591 Implemented
WV0305 # 12 Y:2004 12 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $964 $416 Implemented
WV0305 # 13 Y:2004 13 2004 USE SYNTHETIC LUBRICANT $532 $326 Implemented