IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0013 # 04 Y:2008 04 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $24,218 $25,000 Implemented
DL0013 # 05 Y:2008 05 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,700 $10,000 Implemented
LE0208 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $214,649 $548,400 Not Implemented
LE0208 # 02 Y:2005 02 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $30,000 $2,500 Implemented
LE0208 # 03 Y:2005 03 2005 $25,000 $460 Implemented
LE0208 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,745 $1,250 Implemented
LE0208 # 05 Y:2005 05 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,758 $2,500 Implemented
LE0208 # 06 Y:2005 06 2005 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,676 $1,000 Implemented
LE0208 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,869 $750 Implemented
LE0208 # 08 Y:2005 08 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,927 $450 Not Implemented
LE0208 # 09 Y:2005 09 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,060 $145 Implemented
LE0183 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,086 $21,041 Not Implemented
LE0183 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,467 $500 Not Implemented
LE0183 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,591 $750 Not Implemented
LE0183 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $5,113 $2,497 Not Implemented
LE0183 # 03 Y:2004 03 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,090 $7,000 Not Implemented
LE0183 # 02 Y:2004 02 2004 REPAIR OR REPLACE STEAM TRAPS $49,237 $10,000 Implemented
LE0183 # 01 Y:2004 01 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $54,350 $390,000 n/a
WV0116 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,254 $439 Implemented
WV0116 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $220 $600 Not Implemented
WV0116 # 03 Y:1997 03 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,312 $2,000 Implemented
WV0116 # 04 Y:1997 04 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,636 $11,600 Not Implemented
WV0116 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $262 $268 Implemented
WV0116 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,025 $0 Implemented
WV0116 # 07 Y:1997 07 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $25,500 $5,000 Not Implemented