IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

263

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0257 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $18,309 $36,855 Implemented
WV0257 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,738 $220 Implemented
WV0257 # 09 Y:2003 09 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $37,016 $1,000 Implemented
WV0257 # 11 Y:2003 11 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,974 $6,300 Implemented
WV0257 # 12 Y:2003 12 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $19,542 $1,375 Implemented
WV0257 # 13 Y:2003 13 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $538 $2,900 Implemented
WV0257 # 14 Y:2003 14 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $954 $110 Implemented
LE0131 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,624 $0 Implemented
LE0131 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,376 $4,500 Implemented
LE0127 # 01 Y:2002 01 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,712 $500 Implemented
LE0127 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,413 $100 Implemented
LE0127 # 10 Y:2002 10 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,572 $0 Implemented
LE0120 # 02 Y:2001 02 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,995 $1,000 Implemented
LE0120 # 03 Y:2001 03 2001 IMPROVE LUBRICATION PRACTICES $13,290 $800 Implemented
LE0120 # 04 Y:2001 04 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,381 $0 Implemented
LE0120 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $2,562 $200 Implemented
LE0116 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,897 $0 Implemented
LE0116 # 02 Y:2001 02 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,073 $0 Implemented
LE0116 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,580 $0 Implemented
LE0116 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $239 Implemented
LE0116 # 06 Y:2001 06 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $113 $40 Implemented
LE0103 # 03 Y:2001 03 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,154 $1,600 Implemented
LE0103 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,904 $12,900 Implemented
LE0103 # 06 Y:2001 06 2001 $17,100 $12,300 Implemented
WV0206 # 02 Y:2001 02 2001 USE SYNTHETIC LUBRICANT $120 $118 Implemented