IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0389 # 09 Y:2009 09 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,740 $600 Implemented
WV0389 # 08 Y:2009 08 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,947 $290 Not Implemented
WV0389 # 04 Y:2009 04 2009 DEVELOP A REPAIR/REPLACE POLICY $4,703 $662 Implemented
WV0389 # 11 Y:2009 11 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,462 $2,860 Implemented
WV0389 # 13 Y:2009 13 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $962 $0 Not Implemented
WV0389 # 12 Y:2009 12 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,327 $0 Implemented
WV0389 # 01 Y:2009 01 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,844 $1,000 Implemented
WV0389 # 03 Y:2009 03 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,832 $4,053 Not Implemented
WV0389 # 06 Y:2009 06 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,065 $8,080 Not Implemented
WV0389 # 07 Y:2009 07 2009 USE OPTIMUM THICKNESS INSULATION $2,517 $960 Implemented
WV0389 # 10 Y:2009 10 2009 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,613 $6,810 Not Implemented
WV0124 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $391 $1,080 Implemented
WV0124 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,851 $361 Implemented
WV0124 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,835 $1,740 Implemented
WV0124 # 06 Y:1997 06 1997 REDUCE VENTILATION AIR $7,818 $6,200 Implemented
WV0124 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $150 $290 Not Implemented
WV0124 # 05 Y:1997 05 1997 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $5,413 $0 Implemented
WV0124 # 13 Y:1997 13 1997 $20,734 $5,000 Not Implemented
WV0124 # 12 Y:1997 12 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,143 $1,570 Implemented
WV0124 # 11 Y:1997 11 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,924 $10,000 Not Implemented
WV0124 # 10 Y:1997 10 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,097 $11,000 Not Implemented
WV0124 # 09 Y:1997 09 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,276 $800 Not Implemented
WV0124 # 08 Y:1997 08 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,865 $0 Not Implemented
WV0124 # 07 Y:1997 07 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,549 $3,268 Not Implemented
WV0021 # 07 Y:1994 07 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $690 $0 Implemented