Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
199
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0130 # 09 Y:1997 | 09 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $82 | $33 | Implemented |
WV0130 # 10 Y:1997 | 10 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $507 | $225 | Not Implemented |
WV0130 # 11 Y:1997 | 11 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,512 | $2,300 | Not Implemented |
WV0130 # 13 Y:1997 | 13 | 1997 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $47,040 | $0 | Implemented |
WV0130 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,013 | $235 | Implemented |
WV0130 # 04 Y:1997 | 04 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $107 | $110 | Not Implemented |
WV0130 # 12 Y:1997 | 12 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,687 | $11,000 | Not Implemented |
WV0130 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $184 | $249 | Implemented |
WV0130 # 07 Y:1997 | 07 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $90 | $400 | Not Implemented |
WV0130 # 06 Y:1997 | 06 | 1997 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,634 | $5,160 | Not Implemented |
WV0130 # 05 Y:1997 | 05 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $107 | $80 | Implemented |
WV0130 # 03 Y:1997 | 03 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $391 | $680 | Implemented |
WV0130 # 08 Y:1997 | 08 | 1997 | INSTALL AUTOMATIC STACK DAMPER | $1,234 | $250 | Not Implemented |
HO0163 # 06 Y:1997 | 06 | 1997 | PAY BILLS ON TIME TO AVOID LATE FEES | $432 | $0 | Implemented |
HO0163 # 05 Y:1997 | 05 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $10,800 | $30,000 | Implemented |
HO0163 # 04 Y:1997 | 04 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,139 | $1,000 | Not Implemented |
HO0163 # 03 Y:1997 | 03 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,369 | $50 | Not Implemented |
HO0163 # 07 Y:1997 | 07 | 1997 | REUSE RAGS UNTIL COMPLETELY SOILED | $432 | $0 | Not Implemented |
HO0163 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,383 | $1,982 | Not Implemented |
HO0163 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $921 | $4,297 | Not Implemented |
HO0163 # 08 Y:1997 | 08 | 1997 | RECOVER AND REUSE WASTE MATERIAL | $36,000 | $80,000 | Implemented |
WV0127 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $391 | $200 | Implemented |
WV0127 # 07 Y:1997 | 07 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $96,588 | $16,000 | Not Implemented |
WV0127 # 06 Y:1997 | 06 | 1997 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,192 | $0 | Not Implemented |
WV0127 # 05 Y:1997 | 05 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $19,644 | $12,500 | Not Implemented |