IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

212

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0265 # 08 Y:2007 08 2007 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $429 $600 Not Implemented
LE0265 # 02 Y:2007 02 2007 INSTALL TIMERS AND/OR THERMOSTATS $10,266 $2,250 Implemented
LE0265 # 06 Y:2007 06 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $594 $0 Implemented
LE0265 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,557 $58,273 Not Implemented
LE0265 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $623 $200 Not Implemented
LE0265 # 05 Y:2007 05 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,558 $0 Implemented
LE0265 # 04 Y:2007 04 2007 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,367 $46 Not Implemented
LE0265 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,608 $860 Implemented
LE0265 # 01 Y:2007 01 2007 UTILIZE OUTSIDE CONTRACTING $45,000 $7,800 Implemented
LE0264 # 10 Y:2007 10 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,288 $1,000 Implemented
LE0264 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,084 $500 Implemented
LE0264 # 04 Y:2007 04 2007 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,727 $2,250 Not Implemented
LE0264 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,514 $200 Not Implemented
LE0264 # 03 Y:2007 03 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,204 $2,000 Implemented
LE0264 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,184 $2,500 Implemented
LE0264 # 09 Y:2007 09 2007 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,674 $5,000 Not Implemented
LE0264 # 08 Y:2007 08 2007 USE SYNTHETIC LUBRICANT $3,151 $500 Not Implemented
LE0264 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,103 $2,500 Implemented
LE0264 # 01 Y:2007 01 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,680 $50,000 Implemented
LE0264 # 11 Y:2007 11 2007 INSTALL OCCUPANCY SENSORS $3,069 $750 Not Implemented
WV0364 # 04 Y:2007 04 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $25,424 $32,700 Implemented
WV0364 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $29,507 $12,903 Implemented
WV0364 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $28,283 $0 Implemented
WV0364 # 13 Y:2007 13 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,174 $2,445 Not Implemented
WV0364 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,229 $40,317 Implemented