Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
212
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0265 # 08 Y:2007 | 08 | 2007 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $429 | $600 | Not Implemented |
LE0265 # 02 Y:2007 | 02 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $10,266 | $2,250 | Implemented |
LE0265 # 06 Y:2007 | 06 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $594 | $0 | Implemented |
LE0265 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,557 | $58,273 | Not Implemented |
LE0265 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $623 | $200 | Not Implemented |
LE0265 # 05 Y:2007 | 05 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,558 | $0 | Implemented |
LE0265 # 04 Y:2007 | 04 | 2007 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,367 | $46 | Not Implemented |
LE0265 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,608 | $860 | Implemented |
LE0265 # 01 Y:2007 | 01 | 2007 | UTILIZE OUTSIDE CONTRACTING | $45,000 | $7,800 | Implemented |
LE0264 # 10 Y:2007 | 10 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,288 | $1,000 | Implemented |
LE0264 # 05 Y:2007 | 05 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,084 | $500 | Implemented |
LE0264 # 04 Y:2007 | 04 | 2007 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,727 | $2,250 | Not Implemented |
LE0264 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,514 | $200 | Not Implemented |
LE0264 # 03 Y:2007 | 03 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $4,204 | $2,000 | Implemented |
LE0264 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,184 | $2,500 | Implemented |
LE0264 # 09 Y:2007 | 09 | 2007 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,674 | $5,000 | Not Implemented |
LE0264 # 08 Y:2007 | 08 | 2007 | USE SYNTHETIC LUBRICANT | $3,151 | $500 | Not Implemented |
LE0264 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,103 | $2,500 | Implemented |
LE0264 # 01 Y:2007 | 01 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $25,680 | $50,000 | Implemented |
LE0264 # 11 Y:2007 | 11 | 2007 | INSTALL OCCUPANCY SENSORS | $3,069 | $750 | Not Implemented |
WV0364 # 04 Y:2007 | 04 | 2007 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $25,424 | $32,700 | Implemented |
WV0364 # 02 Y:2007 | 02 | 2007 | INSULATE BARE EQUIPMENT | $29,507 | $12,903 | Implemented |
WV0364 # 03 Y:2007 | 03 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $28,283 | $0 | Implemented |
WV0364 # 13 Y:2007 | 13 | 2007 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,174 | $2,445 | Not Implemented |
WV0364 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,229 | $40,317 | Implemented |