IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0632 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $1,112 $1,037 Implemented
WV0632 # 05 Y:2022 05 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,169 $5,688 Not Implemented
WV0632 # 02 Y:2022 02 2022 IMPROVE COMBUSTION CONTROL CAPABILITY $5,035 $3,423 Implemented
WV0632 # 03 Y:2022 03 2022 UPGRADE CONTROLS ON COMPRESSORS $4,403 $2,234 Not Implemented
WV0632 # 01 Y:2022 01 2022 MINIMIZE WATER USAGE $12,558 $11,644 Not Implemented
WV0632 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $865 $2,227 Not Implemented
WV0632 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,805 $706 Implemented
WV0632 # 12 Y:2022 12 2022 INSTALL OCCUPANCY SENSORS $371 $1,135 Implemented
WV0632 # 08 Y:2022 08 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $727 $92 Implemented
WV0632 # 11 Y:2022 11 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $456 $1,192 Implemented
WV0632 # 09 Y:2022 09 2022 DEVELOP A REPAIR/REPLACE POLICY $714 $1,638 Implemented
WV0632 # 10 Y:2022 10 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $669 $3,115 Implemented
LE0535 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,826 $6,362 Not Implemented
LE0535 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $684 $780 Not Implemented
LE0535 # 04 Y:2022 04 2022 UPGRADE OBSOLETE EQUIPMENT $246,141 $750,000 Not Implemented
LE0535 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,728 $2,200 Not Implemented
LE0535 # 05 Y:2022 05 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $44,811 $140,000 Not Implemented
LE0535 # 06 Y:2022 06 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $75,870 $448,000 Not Implemented
DL0210 # 08 Y:2022 08 2022 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,443 $20,000 Not Implemented
DL0210 # 09 Y:2022 09 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $86,400 $1,000,000 Not Implemented
DL0210 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $41,792 $0 Not Implemented
DL0210 # 02 Y:2022 02 2022 INSTALL SET-BACK TIMERS $14,339 $1,650 Implemented
DL0210 # 03 Y:2022 03 2022 INSTALL SET-BACK TIMERS $4,951 $2,500 Implemented
DL0210 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $264,494 $0 Not Implemented
DL0210 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN WATER LINES AND VALVES $17,648 $50,000 Not Implemented