Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
92
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0325 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $979 | $3,042 | Implemented |
MI0325 # 08 Y:2017 | 08 | 2017 | USE OPTIMUM THICKNESS INSULATION | $1,467 | $388 | Implemented |
MI0325 # 07 Y:2017 | 07 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,220 | $1,600 | Implemented |
MI0325 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,645 | $2,520 | Implemented |
MI0325 # 05 Y:2017 | 05 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,801 | $160 | Implemented |
MI0325 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,058 | $9,700 | Not Implemented |
MI0325 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,332 | $4,841 | Not Implemented |
MI0325 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,604 | $1,660 | Implemented |
MI0325 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,225 | $14,854 | Not Implemented |
MI0324 # 03 Y:2017 | 03 | 2017 | OPTIMIZE PLANT POWER FACTOR | $28,032 | $41,300 | Implemented |
MI0324 # 09 Y:2017 | 09 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,760 | $250 | Not Implemented |
MI0324 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,467 | $4,900 | Implemented |
MI0324 # 10 Y:2017 | 10 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,051 | $1,722 | Implemented |
MI0324 # 11 Y:2017 | 11 | 2017 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $670 | $100 | Not Implemented |
MI0324 # 07 Y:2017 | 07 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,663 | $1,478 | Implemented |
MI0324 # 05 Y:2017 | 05 | 2017 | COMBINE UTILITY METERS | $7,245 | $100 | Not Implemented |
MI0324 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,387 | $8,923 | Implemented |
MI0324 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $3,528 | $1,000 | Implemented |
MI0324 # 02 Y:2017 | 02 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $28,637 | $15,056 | Implemented |
MI0324 # 01 Y:2017 | 01 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $94,097 | $134,000 | Not Implemented |
MI0321 # 02 Y:2017 | 02 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,816 | $7,589 | Implemented |
MI0321 # 05 Y:2017 | 05 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,988 | $6,400 | Not Implemented |
MI0321 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,777 | $5,492 | Not Implemented |
MI0321 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,233 | $3,600 | Implemented |
MI0321 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM THICKNESS INSULATION | $17,954 | $21,920 | Implemented |