IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0469 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $750 Implemented
MA0469 # 06 Y:2000 06 2000 USE WATER-BASED DEVELOPERS AND FINISHERS $527 $960 Implemented
MA0469 # 05 Y:2000 05 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $696 $1,495 Not Implemented
MA0469 # 04 Y:2000 04 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,400 $12,780 Implemented
MA0469 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,374 $1,010 Implemented
MA0469 # 02 Y:2000 02 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,357 $0 Implemented
MA0469 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,392 $17,000 Not Implemented
MA0466 # 03 Y:2000 03 2000 PURCHASE EQUIPMENT INSTEAD OF LEASING $5,244 $30,000 Not Implemented
MA0466 # 02 Y:2000 02 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,410 $50,000 Not Implemented
MA0466 # 04 Y:2000 04 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,737 $3,000 Implemented
MA0466 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,111 $500 Implemented
MA0466 # 06 Y:2000 06 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,805 $2,500 Not Implemented
MA0466 # 07 Y:2000 07 2000 PAY BILLS ON TIME TO AVOID LATE FEES $895 $0 Implemented
MA0466 # 08 Y:2000 08 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $619 $2,380 Not Implemented
MA0466 # 09 Y:2000 09 2000 INSULATE BARE EQUIPMENT $592 $1,700 Not Implemented
MA0466 # 10 Y:2000 10 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $450 $2,153 Not Implemented
MA0466 # 11 Y:2000 11 2000 INSTALL OCCUPANCY SENSORS $450 $150 Implemented
MA0466 # 12 Y:2000 12 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $298 $300 Implemented
MA0466 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,519 $78,600 Implemented
MA0460 # 04 Y:2000 04 2000 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $5,388 $13,800 Implemented
MA0460 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $69,572 $286,600 Not Implemented
MA0460 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,135 $42,000 Not Implemented
MA0460 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,240 $26,115 Not Implemented
MA0460 # 05 Y:2000 05 2000 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $4,828 $1,960 Implemented
MA0460 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,880 $32,900 Implemented