Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
275
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CL1802 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,049 | $0 | Not Implemented |
CL1802 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,272 | $2,080 | Not Implemented |
CL1802 # 01 Y:2018 | 01 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,952 | $0 | Not Implemented |
CL1802 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,648 | $20,897 | Not Implemented |
CL1706 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $1,345 | $623 | Not Implemented |
CL1706 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,574 | $139,384 | Not Implemented |
CL1706 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $66,077 | $125,000 | Not Implemented |
NC0566 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $788 | $200 | Implemented |
NC0566 # 05 Y:2016 | 05 | 2016 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $107,179 | $300,000 | Not Implemented |
NC0566 # 08 Y:2016 | 08 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,802 | $12,000 | Not Implemented |
NC0566 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54,183 | $44,349 | Implemented |
NC0566 # 09 Y:2016 | 09 | 2016 | REPAIR AND ELIMINATE STEAM LEAKS | $2,230 | $1,000 | Implemented |
NC0566 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,988 | $100 | Implemented |
NC0566 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $231,779 | $419,073 | Implemented |
NC0566 # 04 Y:2016 | 04 | 2016 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $52,211 | $10,000 | Not Implemented |
NC0566 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,757 | $5,000 | Implemented |
NC0566 # 10 Y:2016 | 10 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,287 | $2,000 | Implemented |
NC0566 # 11 Y:2016 | 11 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $4,453 | $4,256 | Implemented |
NC0566 # 12 Y:2016 | 12 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,706 | $230 | Implemented |
GT0889 # 04 Y:2012 | 04 | 2012 | REDUCE EXCESS STEAM BLEEDING | $19,253 | $45,075 | Not Implemented |
GT0889 # 05 Y:2012 | 05 | 2012 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $24,926 | $6,000 | Not Implemented |
GT0889 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $4,743 | $3,920 | Not Implemented |
GT0889 # 02 Y:2012 | 02 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $14,795 | $8,500 | Not Implemented |
GT0889 # 01 Y:2012 | 01 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,925 | $1,000 | Not Implemented |
GT0796 # 03 Y:2004 | 03 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $835 | $0 | Implemented |