Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
74
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CL2017 # 05 Y:2020 | 05 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,006 | $789 | Implemented |
CL2017 # 04 Y:2020 | 04 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $1,387 | $0 | Implemented |
CL2017 # 03 Y:2020 | 03 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,093 | $0 | Not Implemented |
CL2017 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,804 | $2,100 | Implemented |
CL2017 # 01 Y:2020 | 01 | 2020 | INSTALL OCCUPANCY SENSORS | $206 | $230 | Implemented |
CL2016 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $5,838 | $656 | Implemented |
CL2016 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,376 | $1,720 | Implemented |
CL2016 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,257 | $43,750 | Not Implemented |
CL2016 # 05 Y:2020 | 05 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $967 | $400 | Not Implemented |
CL2016 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,588 | $3,733 | Implemented |
CL2016 # 08 Y:2020 | 08 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,055 | $2,500 | Implemented |
CL2016 # 07 Y:2020 | 07 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $567 | $0 | Implemented |
CL2016 # 06 Y:2020 | 06 | 2020 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $797 | $0 | Implemented |
CL2015 # 01 Y:2020 | 01 | 2020 | MODIFY STARTUP/SHUTDOWN TIMES | $7,855 | $550 | Not Implemented |
CL2015 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,229 | $4,600 | Not Implemented |
CL2015 # 03 Y:2020 | 03 | 2020 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $53 | $0 | Not Implemented |
CL2015 # 02 Y:2020 | 02 | 2020 | USE OPTIMUM TEMPERATURE | $17,243 | $0 | Not Implemented |
NC0654 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,735 | $130,000 | Not Implemented |
NC0654 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,030 | $75,000 | Not Implemented |
NC0654 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,381,024 | $8,000,000 | Not Implemented |
NC0654 # 04 Y:2020 | 04 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,543 | $6,700 | Not Implemented |
NC0654 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,303 | $20,000 | Not Implemented |
CL2014 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $51,784 | $23,313 | Implemented |
CL2014 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $10,901 | $2,295 | Implemented |
CL2014 # 03 Y:2020 | 03 | 2020 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $922 | $862 | Not Implemented |