IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0516 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $952 $796 Implemented
TN0516 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,597 $460 Implemented
TN0516 # 05 Y:1994 05 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $2,022 $3,735 Implemented
TN0516 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $14,244 $2,200 Implemented
TN0516 # 02 Y:1994 02 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $24,983 $1,750 Implemented
TN0516 # 01 Y:1994 01 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $81,008 $114,200 Implemented
TN0321 # 11 Y:1987 11 1987 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $715 $475 Implemented
TN0321 # 12 Y:1987 12 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $466 $0 Implemented
TN0321 # 10 Y:1987 10 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $823 $470 Implemented
TN0321 # 09 Y:1987 09 1987 INSULATE BARE EQUIPMENT $885 $615 Implemented
TN0321 # 08 Y:1987 08 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,072 $800 Implemented
TN0321 # 07 Y:1987 07 1987 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,522 $5,544 Not Implemented
TN0321 # 06 Y:1987 06 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,004 $0 Implemented
TN0321 # 05 Y:1987 05 1987 SHUT OFF PILOTS IN STANDBY EQUIPMENT $769 $0 Implemented
TN0321 # 01 Y:1987 01 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,567 $3,500 Implemented
TN0321 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,710 $180 Implemented
TN0321 # 04 Y:1987 04 1987 RECOVER WASTE HEAT FROM EQUIPMENT $795 $300 Implemented
TN0321 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,320 $432 Implemented
TN0217 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,488 $0 Not Implemented
TN0217 # 06 Y:1984 06 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,447 $0 Implemented
TN0217 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,610 $50 Implemented
TN0217 # 01 Y:1984 01 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $51,259 $42,740 Not Implemented
TN0217 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $24,926 $1,300 Implemented
TN0217 # 03 Y:1984 03 1984 REPAIR AND ELIMINATE STEAM LEAKS $22,604 $1,425 Implemented
TN0217 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,424 $1,200 Implemented