IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

310

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0250 # 06 Y:2021 06 2021 UPGRADE CONTROLS ON COMPRESSORS $1,587 $3,500 Implemented
TT0250 # 07 Y:2021 07 2021 AVOID EMERGENCY REWIND OF MOTORS $1,333 $400 Implemented
TT0245 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,143 $150 Implemented
TT0245 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,356 $900 Not Implemented
TT0245 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,084 $1,500 Implemented
TT0245 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $1,789 $4,500 Not Implemented
TT0220 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,872 $88,116 Implemented
TT0220 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,527 $945 Not Implemented
TT0220 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,995 $6,300 Implemented
TT0220 # 06 Y:2019 06 2019 RECOVER WASTE HEAT FROM EQUIPMENT $5,115 $15,000 Not Implemented
TT0220 # 07 Y:2019 07 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,624 $2,150 Not Implemented
TT0220 # 09 Y:2019 09 2019 CHECK FOR ACCURACY OF UTILITY / POWER METERS $340 $60 Implemented
TT0220 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,534 $60 Implemented
TT0220 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,304 $80 Implemented
TT0220 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $34,064 $64,000 Not Implemented
TT0219 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,170 $61,967 Implemented
TT0219 # 08 Y:2019 08 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,757 $16,291 Implemented
TT0219 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $18,588 $10,000 Not Implemented
TT0219 # 06 Y:2019 06 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,306 $18,000 Not Implemented
TT0219 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,725 $12,000 Not Implemented
TT0219 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,337 $31,000 Not Implemented
TT0219 # 09 Y:2019 09 2019 APPLY FOR INVESTMENT INCENTIVES $1,440 $0 Implemented
TT0219 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $50,161 $360 Implemented
TT0219 # 03 Y:2019 03 2019 USE OPTIMUM THICKNESS INSULATION $27,754 $105,000 Implemented
TT0197 # 01 Y:2017 01 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $19,976 $72,881 Not Implemented