IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

348

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0297 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,428 $1,950 n/a
TT0297 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $11,161 $14,500 n/a
TT0297 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $735 $750 n/a
TT0297 # 07 Y:2023 07 2023 REUSE RICH WHITE WATER IN OTHER APPLICATIONS $1,230 $1,820 n/a
TT0244 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $4,684 $200 Implemented
TT0244 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $5,714 $15,000 Not Implemented
TT0244 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $97,307 $190,198 Implemented
TT0244 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $131 $167 Not Implemented
TT0244 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,937 $40 Not Implemented
TT0244 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,956 $275 Not Implemented
TT0244 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $16,484 $39,000 Not Implemented
TT0233 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,859 $20 Implemented
TT0233 # 05 Y:2020 05 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,206 $22,392 Not Implemented
TT0233 # 02 Y:2020 02 2020 METER WASTE WATER $52,049 $2,000 Implemented
TT0233 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,084 $30,000 Implemented
TT0233 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $43,091 $147,540 Implemented
TT0233 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $565 $1,450 Not Implemented
TT0233 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,658 $2,000 Implemented
TT0227 # 07 Y:2019 07 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $399 $750 Not Implemented
TT0227 # 06 Y:2019 06 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,110 $550 Not Implemented
TT0227 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $2,646 $2,000 Implemented
TT0227 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,227 $2,000 Implemented
TT0227 # 03 Y:2019 03 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,828 $5,000 Implemented
TT0227 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,143 $2,500 Not Implemented
TT0227 # 01 Y:2019 01 2019 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $73,127 $4,450 Not Implemented