IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

348

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0050 # 03 Y:2010 03 2010 USE OPTIMUM THICKNESS INSULATION $6,800 $1,000 Not Implemented
TT0050 # 04 Y:2010 04 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,900 $500 Implemented
TT0050 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,200 $0 Implemented
TT0050 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $500 $400 Not Implemented
TT0034 # 03 Y:2009 03 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,250 $4,800 Not Implemented
TT0034 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,900 $800 Implemented
TT0034 # 05 Y:2009 05 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,300 $20,000 Not Implemented
TT0034 # 01 Y:2009 01 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,000 $47,500 Not Implemented
TT0034 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,800 $2,500 Not Implemented
TT0034 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,950 $5,000 Not Implemented
TT0034 # 07 Y:2009 07 2009 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,000 $0 Implemented
TT0034 # 08 Y:2009 08 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,400 $0 Implemented
TT0027 # 01 Y:2008 01 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,297 $250 Implemented
TT0027 # 04 Y:2008 04 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $25,272 $22,000 Not Implemented
TT0027 # 05 Y:2008 05 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $16,221 $30,000 Not Implemented
TT0027 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,204 $862 Not Implemented
TT0027 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,340 $5,000 Implemented
TT0022 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $154,961 $376,774 Not Implemented
TT0022 # 01 Y:2008 01 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $10,000 $2,500 Not Implemented
TT0022 # 02 Y:2008 02 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $23,950 $15,491 Not Implemented
TT0022 # 03 Y:2008 03 2008 UPGRADE CONTROLS ON COMPRESSORS $23,300 $50,530 Not Implemented
TT0022 # 12 Y:2008 12 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $683 Not Implemented
TT0022 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,304 $26,136 Not Implemented
TT0022 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,600 $10,900 Not Implemented
TT0022 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,022 $14,263 Not Implemented