IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0245 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,084 $1,500 Implemented
TT0245 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,356 $900 Not Implemented
TT0245 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $1,789 $4,500 Not Implemented
TT0245 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,143 $150 Implemented
TT0244 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $4,684 $200 Implemented
TT0244 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $5,714 $15,000 Not Implemented
TT0244 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,937 $40 Not Implemented
TT0244 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $97,307 $190,198 Implemented
TT0244 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $16,484 $39,000 Not Implemented
TT0244 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,956 $275 Not Implemented
TT0244 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $131 $167 Not Implemented
TT0242 # 01 Y:2020 01 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,906,442 $4,500,000 Implemented
TT0242 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,412 $62,026 Not Implemented
TT0242 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,394 $110,050 Not Implemented
TT0242 # 04 Y:2020 04 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $13,945 $1,900 Not Implemented
TT0242 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,251 $263 Not Implemented
TT0242 # 06 Y:2020 06 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,854 $1,700 Not Implemented
TT0243 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $294,548 $574,658 Implemented
TT0243 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $45,344 $83,600 Not Implemented
TT0243 # 02 Y:2020 02 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $84,184 $2,000 Not Implemented
TT0243 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $36,281 $7,500 Not Implemented
TT0243 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $63,580 $248,619 Not Implemented
TT0243 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,111 $600 Implemented
TT0239 # 07 Y:2020 07 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,471 $2,000 Implemented
TT0239 # 05 Y:2020 05 2020 INSTALL TIMERS AND/OR THERMOSTATS $5,210 $40 Not Implemented