IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0281 # 04 Y:2022 04 2022 AIR CONDITION ONLY SPACE NECESSARY $5,133 $6,000 n/a
TT0281 # 10 Y:2022 10 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $408 $63 n/a
TT0281 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,419 $2,740 n/a
TT0281 # 08 Y:2022 08 2022 INSULATE BARE EQUIPMENT $1,876 $2,748 n/a
TT0281 # 02 Y:2022 02 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $24,436 $109,567 n/a
TT0281 # 01 Y:2022 01 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $58,911 $10,000 n/a
TT0281 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,188 $560 n/a
TT0281 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $12,034 $44,013 n/a
TT0281 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,821 $4,500 n/a
TT0281 # 09 Y:2022 09 2022 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,000 $25 n/a
TT0277 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $15,235 $8,435 Not Implemented
TT0277 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $812 $1,090 Not Implemented
TT0277 # 05 Y:2022 05 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,371 $4,045 Not Implemented
TT0277 # 02 Y:2022 02 2022 ADOPT IN-HOUSE MATERIAL GENERATION $11,462 $31,920 Not Implemented
TT0277 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,904 $3,000 Not Implemented
TT0277 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,769 $2,815 Not Implemented
TT0277 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,116 $2,790 Not Implemented
TT0277 # 06 Y:2022 06 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,278 $500 Not Implemented
TT0282 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $42,363 $21,260 Implemented
TT0282 # 01 Y:2022 01 2022 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $816,618 $2,873,364 Implemented
TT0282 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,200 $15,000 Implemented
TT0282 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,290 $58,960 Implemented
TT0282 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,725 $152,000 Implemented
TT0282 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $360,908 $51,360 Implemented
TT0282 # 08 Y:2022 08 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $542 $1,120 Not Implemented