IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0008 # 01 Y:2018 01 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,536 $3,860 Implemented
TR0008 # 02 Y:2018 02 2018 INSULATE BARE EQUIPMENT $692 $602 Not Implemented
TR0008 # 06 Y:2018 06 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,464 $0 Not Implemented
TR0008 # 04 Y:2018 04 2018 MAINTAIN MACHINES TO REDUCE LEAKS $13,889 $1,000 Implemented
TR0008 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $2,128 Implemented
TR0008 # 03 Y:2018 03 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $28,264 $975 Implemented
AM0753 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,122 $4,000 Not Implemented
AM0753 # 12 Y:2018 12 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $635 $258 Not Implemented
AM0753 # 11 Y:2018 11 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $871 $829 Not Implemented
AM0753 # 09 Y:2018 09 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,326 $8 Not Implemented
AM0753 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,100 $0 Not Implemented
AM0753 # 03 Y:2018 03 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,100 $0 Not Implemented
AM0753 # 04 Y:2018 04 2018 METER WASTE WATER $6,905 $2,650 Not Implemented
AM0753 # 05 Y:2018 05 2018 OPTIMIZE PLANT POWER FACTOR $5,666 $14,090 Not Implemented
AM0753 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,750 $0 Not Implemented
AM0753 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,377 $5,228 Implemented
AM0753 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $1,662 $1,732 Not Implemented
AM0753 # 10 Y:2018 10 2018 PAY UTILITY BILLS ON TIME $1,108 $0 Not Implemented
AM0749 # 08 Y:2018 08 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $623 $140 Not Implemented
AM0749 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,109 $5,410 Not Implemented
AM0749 # 01 Y:2018 01 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $136,440 $167,100 Not Implemented
AM0749 # 02 Y:2018 02 2018 COMBINE UTILITY METERS $65,915 $10,000 Not Implemented
AM0749 # 03 Y:2018 03 2018 OPTIMIZE PLANT POWER FACTOR $31,797 $45,252 Not Implemented
AM0749 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,000 $15,400 Not Implemented
AM0749 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,165 $40 Not Implemented