IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0809 # 12 Y:2011 12 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,221 $3,340 Not Implemented
OK0809 # 11 Y:2011 11 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,066 $2,000 Implemented
OK0809 # 10 Y:2011 10 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,425 $595 Not Implemented
OK0809 # 09 Y:2011 09 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $3,755 $1,092 Implemented
OK0809 # 08 Y:2011 08 2011 REPAIR AND ELIMINATE STEAM LEAKS $26,809 $375 Implemented
OK0809 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $32,884 $59,335 Not Implemented
OK0809 # 02 Y:2011 02 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,809 $46,235 Implemented
OK0809 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,138 $2,588 Implemented
OK0809 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $3,472 $1,238 Implemented
OK0809 # 05 Y:2011 05 2011 DISCONNECT BALLASTS $20,420 $3,787 Implemented
OK0809 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,485 $6,134 Implemented
OK0809 # 07 Y:2011 07 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,975 $17,104 Not Implemented
AM0594 # 02 Y:2011 02 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,850 $0 Implemented
AM0594 # 06 Y:2011 06 2011 USE SYNTHETIC LUBRICANT $393 $0 Not Implemented
AM0594 # 05 Y:2011 05 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $650 $270 Implemented
AM0594 # 04 Y:2011 04 2011 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $1,150 $0 Not Implemented
AM0594 # 03 Y:2011 03 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,246 $180 Not Implemented
AM0594 # 01 Y:2011 01 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $74,000 $26,000 Not Implemented
AM0591 # 01 Y:2011 01 2011 MINIMIZE WATER USAGE $141,000 $80,000 Not Implemented
AM0591 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $42,800 $13,800 Not Implemented
AM0591 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $10,060 $15,900 Implemented
AM0591 # 04 Y:2011 04 2011 REPAIR AND ELIMINATE STEAM LEAKS $9,540 $5,000 Implemented
AM0591 # 05 Y:2011 05 2011 REPAIR OR REPLACE STEAM TRAPS $5,270 $1,300 Implemented
AM0591 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,275 $4,290 Implemented
AM0591 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $2,200 $950 Implemented