IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0240 # 09 Y:1995 09 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $500 Implemented
AM0229 # 02 Y:1995 02 1995 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $32,000 $42,000 Implemented
AM0229 # 01 Y:1995 01 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $53,900 $0 Implemented
AM0229 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,760 $570 Implemented
AM0229 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $200 Implemented
AM0205 # 09 Y:1994 09 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $433 $0 Implemented
AM0205 # 08 Y:1994 08 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $590 $80 Implemented
AM0205 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $2,800 $490 Implemented
AM0205 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $3,660 $1,890 Implemented
AM0205 # 04 Y:1994 04 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,170 $630 Implemented
AM0205 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,430 $0 Implemented
AM0205 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,830 $0 Implemented
AM0205 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $14,843 $23,805 Implemented
AM0196 # 02 Y:1994 02 1994 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $14,100 $19,783 Implemented
AM0196 # 01 Y:1994 01 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $33,400 $0 Implemented
AM0196 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $382 $349 Implemented
AM0187 # 07 Y:1993 07 1993 USE SYNTHETIC LUBRICANT $190 $0 Implemented
AM0187 # 04 Y:1993 04 1993 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,150 $1,000 Implemented
AM0187 # 03 Y:1993 03 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,800 $370 Implemented
AM0187 # 02 Y:1993 02 1993 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,720 $0 Implemented
AM0165 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,330 $2,520 Implemented
AM0165 # 02 Y:1992 02 1992 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,300 $3,630 Implemented
AM0165 # 01 Y:1992 01 1992 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $23,570 $1,350 Implemented
AM0165 # 08 Y:1992 08 1992 INSTALL SET-BACK TIMERS $150 $190 Implemented
AM0058 # 02 Y:1989 02 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $280 $300 Implemented