IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0065 # 08 Y:2003 08 2003 MOVE BOILER TO MORE EFFICIENT LOCATION $1,422 $1,894 Implemented
TA0065 # 11 Y:2003 11 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $146 $142 Not Implemented
TA0065 # 10 Y:2003 10 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $194 $0 Not Implemented
TA0065 # 09 Y:2003 09 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $306 $140 Implemented
TA0065 # 03 Y:2003 03 2003 USE "WASH-LESS" PROCESSING EQUIPMENT $49,000 $1,768 Not Implemented
TA0065 # 02 Y:2003 02 2003 $64,800 $5,200 Implemented
TA0065 # 01 Y:2003 01 2003 REDESIGN PROCESS $75,086 $0 Implemented
TA0065 # 05 Y:2003 05 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,900 $0 Implemented
TA0065 # 07 Y:2003 07 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,793 $0 Implemented
TA0065 # 06 Y:2003 06 2003 $2,426 $6,000 Implemented
TA0065 # 04 Y:2003 04 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $37,440 $1,027 Not Implemented
TA0060 # 04 Y:2003 04 2003 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $4,700 $0 Not Implemented
TA0060 # 03 Y:2003 03 2003 PAY UTILITY BILLS ON TIME $4,647 $0 Not Implemented
TA0060 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,880 $150 Not Implemented
TA0060 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,300 $11,530 Not Implemented
TA0060 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $2,140 $506 Not Implemented
TA0060 # 06 Y:2003 06 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $670 $1,060 Not Implemented
TA0060 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $460 $83 Not Implemented
AM0438 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $12,900 $18,200 Implemented
AM0438 # 02 Y:2003 02 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,900 $0 Implemented
AM0438 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,700 $0 Implemented
AM0438 # 04 Y:2003 04 2003 RECOVER AND REUSE WASTE MATERIAL $2,350 $0 Implemented
AM0438 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $260 $60 Not Implemented
AM0433 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $175 $420 Not Implemented
AM0433 # 05 Y:2003 05 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,385 $720 Not Implemented