IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

324

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0500 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $6,900 $6,900 Implemented
AM0500 # 07 Y:2006 07 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,800 $0 Implemented
AM0500 # 08 Y:2006 08 2006 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $430 $0 Implemented
AM0500 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $343 $192 Implemented
TA0104 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $6,461 $244 Implemented
TA0104 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,785 $1,444 Implemented
TA0104 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,491 $241 Implemented
TA0104 # 02 Y:2005 02 2005 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $22,990 $0 Implemented
TA0104 # 01 Y:2005 01 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,070 $0 Implemented
TA0103 # 02 Y:2005 02 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,365 $2,620 Implemented
TA0103 # 05 Y:2005 05 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $700 $1,070 Implemented
TA0103 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,990 $0 Implemented
TA0103 # 03 Y:2005 03 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $14,113 $0 Implemented
TA0081 # 07 Y:2004 07 2004 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,035 $0 Implemented
TA0081 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,390 $40 Implemented
TA0081 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $11,360 $0 Implemented
TA0081 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $14,775 $0 Implemented
AM0467 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $11,900 $2,160 Implemented
AM0467 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,900 $450 Implemented
AM0467 # 03 Y:2004 03 2004 PAY UTILITY BILLS ON TIME $6,075 $0 Implemented
AM0467 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,170 $0 Implemented
AM0467 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,000 $6 Implemented
AM0467 # 06 Y:2004 06 2004 REUSE RAGS UNTIL COMPLETELY SOILED $700 $0 Implemented
AM0467 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $175 Implemented
AM0467 # 09 Y:2004 09 2004 USE SYNTHETIC LUBRICANT $240 $0 Implemented