IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0064 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,652 $12,200 Implemented
AM0253 # 05 Y:1995 05 1995 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,170 $0 Implemented
AM0253 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $35,300 $92,500 Implemented
AM0253 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,500 $3,000 Implemented
AM0253 # 04 Y:1995 04 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,860 $5,720 Implemented
AM0253 # 06 Y:1995 06 1995 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $727 $95 Implemented
AM0253 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,250 $1,000 Implemented
AM0221 # 04 Y:1994 04 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,180 $200 Implemented
AM0221 # 05 Y:1994 05 1994 RECYCLE CASTING SAND $37,570 $0 Implemented
AM0221 # 03 Y:1994 03 1994 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,430 $0 Implemented
AM0113 # 02 Y:1991 02 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,390 $88,900 Implemented
AM0113 # 01 Y:1991 01 1991 USE UTILITY CONTROLLED POWER MANAGEMENT $687,000 $250,000 Implemented
AM0113 # 03 Y:1991 03 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,300 $280 Implemented
AM0113 # 04 Y:1991 04 1991 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $2,815 $400 Implemented
AM0113 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $340 $290 Implemented
AM0044 # 01 Y:1988 01 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $119,040 $0 Implemented
AM0044 # 05 Y:1988 05 1988 REDESIGN PROCESS $3,863 $2,147 Implemented
AM0044 # 07 Y:1988 07 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,500 $1,100 Implemented
AM0044 # 10 Y:1988 10 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $747 $0 Implemented
LT0048 # 06 Y:1985 06 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $497 $250 Implemented
LT0048 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,567 $2,600 Implemented
LT0048 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $566 $197 Implemented
LT0048 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $220 $0 Implemented
LT0048 # 02 Y:1985 02 1985 INSTALL SET-BACK TIMERS $326 $0 Implemented
LT0048 # 01 Y:1985 01 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $274 $71 Implemented