Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,900
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0448 # 02 Y:2003 | 02 | 2003 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $24,300 | $5,730 | Implemented |
AM0448 # 05 Y:2003 | 05 | 2003 | USE SYNTHETIC LUBRICANT | $4,032 | $0 | Implemented |
AM0448 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,200 | $1,550 | Not Implemented |
AM0448 # 08 Y:2003 | 08 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $500 | $70 | Implemented |
AM0448 # 01 Y:2003 | 01 | 2003 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,266,100 | $805,000 | Implemented |
AM0448 # 09 Y:2003 | 09 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,600 | $0 | Implemented |
AM0448 # 10 Y:2003 | 10 | 2003 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $13,780 | $0 | Implemented |
AM0448 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,000 | $2,000 | Implemented |
AM0448 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,120 | $25 | Implemented |
AM0448 # 06 Y:2003 | 06 | 2003 | INSULATE BARE EQUIPMENT | $2,200 | $2,000 | Implemented |
TA0067 # 01 Y:2003 | 01 | 2003 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $19,270 | $-19,270 | Implemented |
TA0067 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,970 | $13,700 | Not Implemented |
TA0067 # 07 Y:2003 | 07 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,240 | $0 | Implemented |
TA0067 # 08 Y:2003 | 08 | 2003 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $3,960 | $2,510 | Implemented |
TA0067 # 03 Y:2003 | 03 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,675 | $0 | Not Implemented |
TA0067 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,210 | $400 | Not Implemented |
TA0067 # 04 Y:2003 | 04 | 2003 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $7,485 | $480 | Implemented |
TA0067 # 10 Y:2003 | 10 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,940 | $200 | Implemented |
TA0067 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,910 | $0 | Implemented |
TA0067 # 05 Y:2003 | 05 | 2003 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,185 | $485 | Implemented |
TA0066 # 08 Y:2003 | 08 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $557 | $0 | Not Implemented |
TA0066 # 02 Y:2003 | 02 | 2003 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $2,218 | $0 | Implemented |
TA0066 # 04 Y:2003 | 04 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,240 | $3,740 | Not Implemented |
TA0066 # 03 Y:2003 | 03 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,854 | $0 | Implemented |
TA0066 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $29,101 | $28,080 | Implemented |